The Tumwater Historic Preservation Commission endorsed the remodel of Olympia Tumwater Foundation’s administrative building by granting a certificate of appropriateness.
The preservation commission made their decision after a presentation from the project architect, Carve Architects, at a meeting on Nov. 19.
The foundation plans to turn the building at Brewery Parks at Tumwater Falls into a public-facing facility, which will be called the History and Nature Center.
Tom Rieger, of Carve Architects, told commission members that the project involves expanding the interior, removing a maintenance shop, and relocating offices to he southwest corner of the building.
The changes would increase the interior space to 3,121 square feet from 1,994 square feet. Much of the expanded space will now be open to the public, creating space for exhibits, gatherings and visitor services.
Olympia Tumwater Foundation Executive Director Todd Cutts noted a committee of historians and educators has been formed to curate exhibits. The committee aims to focus on themes, such as Indigenous history, historical industries, the brewery's history, and stories of the waterfalls and the Deschutes River.
Reiger addeed that access to the building will be enhanced with a covered entrance to the south.
At the back patio, which faces Tumwater Falls, an overhanging roof is going to be modified into a butterfly roof so the view of the surrounding area is expanded.
Constructed in 1962 by Robert Olson, the building features utilitarian elements highlighted by vertical panel sliding, repeating columns, as well as deep roof overhangs.
To preserve the building’s style, all the columns are going to be retained. Reiger said the building’s brown color is going to be kept, while introducing lighter tones.
The foundation aims to submit permits for the project by late December with hopes to start construction in February 2027.
Comments
No comments on this item Please log in to comment by clicking here